Technical Information for Textured Masonry Units
Quality Assurance
Certifications: Concrete blocks for finishing shall conform to
ASTM C90, Type1. The provisions of ASTM C90 Paragraph
7.3.1 apply with regard to imperfections.
Delivery, Storage
and Handling
Units shall be delivered to the job site on
pallets. Store pallets in single stacks on level ground
and cover with waterproof covering (e.g. tarpaulins) to protect
the blocks from inclement weather. Handle blocks carefully
to avoid breakage and damage to the finished surfaces.
Project/Site
Conditions
Protection of work: Cover walls each day after installation to
keep open walls protected and dry.
Part 2-Products:
Product Name
Textured Masonry Units.
Sizes And Shapes
Nominal 2", 4", 6", 8", 10", and
12" standard block thicknesses are available as well as all
standard block shapes. High strength units for special
structural requirements are also available. Metric shapes
and sizes available.
Water Repellency
Units required to meet water repellency
specifications will be manufactured with W.R. Grace DRY-BLOCK®
water repellent admixture.
Part 3-Execution:
Laying Masonry Walls
Lay units using the best concrete masonry practices.
Install only quality units; reject all defective units.
Align units level, plumb, and true with uniform, carefully
tooled 3/8" wide joints on the textured face side of the
wall. Draw blocks from more than one pallet at a time
during installation. Use W.R. Grace DRY-BLOCK® water
repellent mortar admixture, following manufacturer's
instructions, in all exterior mortar.
Installation
Cutting: Make all unit cuts, including those for bonding, holes,
boxes, etc. with motor driven masonry saws, using either an
abrasive or diamond blade. Cut neatly and locate for best
appearance.
Inspection
The textured faces shall be free from chips, cracks, crazes or
any other imperfection that would detract from the overall
appearance of the finished wall when viewed from a distance of
twenty (20) feet at right angles to the wall with normal
lighting.
Flashing of
Masonry Work
Install flashing at locations shown in the plans and in strict
accordance with the details and the best masonry flashing
practices using W.R. Grace Perm-A-Barrier®
Weep Holes And
Vents
Install weep holes and vents at proper intervals (32"
O.C. and 2" long, above bed joints, typical) at courses
above grade, above flashing, and at any water stops over
windows, doors and beams.
Pointing
Tuckpoint the joints of scored EarthStone® units.
Cleaning
Keep walls clean daily during installation using brushes.
Do not allow excess mortar lumps or smears to harden on the
finished surfaces. Remove green mortar. Harsh
cleaning methods after walls have been erected may mar the
surface of the blocks.
Final Cleandown
Clean the completed walls with a detergent masonry cleaner
strictly following the manufacturer's instructions including
thorough rinsing. Do not use acid or abrasives on the
finished surfaces.
|