SPECIFICATION FOR SEGMENTAL RETAINING WALL SYSTEMS
PART 1: GENERAL
1.01 Description
A. Work includes furnishing and installing segmental retaining wall (SRW)
units to the lines and grades designated on the project's final
construction drawings or as directed by the Architect/Engineer. Also
included is furnishing and installing appurtenant materials required for
construction of the retaining wall as shown on the construction drawings.
1.02 Reference Standards
A. Segmental Retaining Wall Units
1. ASTM C 1372 - Standard Specification for Segmental Retaining Wall Units
2. ASTM C 140 - Standard Test Methods of Sampling and Testing Concrete
Masonry Units
B. Geosynthetic Reinforcement
1. ASTM D 4595 - Tensile Properties of Geotextiles by the Wide-Width Strip
Method
2. ASTM D 5262 - Test Method for Evaluating the Unconfined Creep Behavior
of Geosynthetics
3. GRI:GG1 - Single Rib Geogrid Tensile Strength
4. GRI:GG5 - Geogrid Pullout
C. Soils
1. ASTM D 698 - Moisture Density Relationship for Soils, Standard Method
2. ASTM D 422 - Gradation of Soils
3. ASTM D 424 - Atterberg Limits of Soil
D. Drainage Pipe
1. ASTM D 3034 - Specification for Polyvinyl Chloride (PVC) Plastic Pipe
2. ASTM D 1248 - Specification for Corrugated Plastic Pipe
E. Engineering Design
1. "NCMA Design Manual for Segmental Retaining Walls", Second Edition
F. Where specifications and reference documents conflict, the
Architect/Engineer shall make the final determination of applicable
document.
1.03 Submittals
A. Material Submittals: The Contractor shall submit manufacturers'
certifications two weeks prior to start of work stating that the SRW units
and geosynthetic reinforcement meet the requirements of Section 2 of this
specification.
B. Design Submittal: The Contractor shall submit two sets of detailed
design calculations and final retaining wall plans for approval at least
two weeks prior to the beginning of wall construction. All calculations
and drawings shall be prepared and sealed by a professional Civil Engineer
(P.E.) - (Wall Design Engineer) experienced in SRW design and licensed in
the state where the wall is to be built.
1.04 Delivery, Storage and Handling
A. Contractor shall check materials upon delivery to assure that specified
type and grade of materials have been received and proper color and
texture of SRW units have been received.
B. Contractor shall prevent excessive mud, wet concrete, epoxies, and like
materials that may affix themselves, from coming in contact with
materials.
C. Contractor shall store and handle materials in accordance with
manufacturer's recommendations.
D. Contractor shall protect materials from damage. Damaged materials shall
not be incorporated into the retaining wall.
PART 2: MATERIALS
2.01 Segmental Retaining Wall Units
A. SRW units shall be machine formed, Portland Cement concrete blocks
specifically designed for retaining wall applications. SRW units currently
approved for this project are:
VERSA-LOK Retaining Wall Units as manufactured by ___________________.
B. Color of SRW units shall be _____________.
C. Finish of SRW units shall be split face.
D. SRW unit faces shall be of straight geometry.
E. SRW unit height shall be six inches.
F. SRW units (not including aggregate fill in unit voids) shall provide a
minimum weight of 105 psf wall face area.
G. SRW units shall be solid through the full depth of the unit.
H. SRW units shall have a depth (front face to rear) to height ratio of
2:1, minimum.
I. SRW units shall be interlocked with connection pins, designed with
proper setback to provide 8:1 vertical to horizontal batter (a 7 degree
cant from vertical).
J. SRW units shall be capable of being erected with the horizontal gap
between adjacent units not exceeding 1/8 inches.
K. SRW units shall be capable of providing overlap of units on each
successive course so that walls meeting at corner are interlocked and
continuous. SRW units that require corners to be mitered shall not be
allowed.
L. SRW units shall be capable of providing a split face, textured surface
for all vertical surfaces that will be exposed after completion of wall,
including any exposed sides and backs of units.
M. SRW units shall be sound and free of cracks or other defects that would
interfere with the proper placing of the unit or significantly impair the
strength or permanence of the structure. Cracking or excessive chipping
may be grounds for rejection. Units showing cracks longer than 1/2" shall
not be used within the wall. Units showing chips visible at a distance of
30 feet from the wall shall not be used within the wall.
N. Concrete used to manufacture SRW units shall have a minimum 28 days
compressive strength of 3,000 psi and a maximum moisture absorption rate,
by weight, of 8% as determined in accordance with ASTM C1372. Compressive
strength test specimens shall conform to the saw-cut coupon provisions of
ASTM C140.
O. SRW units' molded dimensions shall not differ more than + 1/8 inch from
that specified, in accordance with ASTM C1372.
2.02 Segmental Retaining Wall Unit Connection Pins
A. SRW units shall be interlocked with VERSA-Tuff connection pins. The
pins shall consist of glass-reinforced nylon made for the expressed use
with the SRW units supplied.
2.03 Geosynthetic Reinforcement
A. Geosynthetic reinforcement shall consist of geogrids or geotextiles
manufactured as a soil reinforcement element. The manufacturers/suppliers
of the geosynthetic reinforcement shall have demonstrated construction of
similar size and types of segmental retaining walls on previous projects.
The geosynthetic type must be approved one week prior to bid opening.
Geosynthetic types currently approved for this project are:
VERSA-Grid Geogrids
B. The type, strength, and placement location of the reinforcing
geosynthetic shall be as determined by the Wall Design Engineer, as shown
on the final, P.E. sealed retaining wall plans.
2.04 Leveling Pad
A. Material for leveling pad shall consist of compacted sand, gravel, or
combination thereof (USCS soil types GP,GW, SP, & SW) and shall be a
minimum of 6 inches in depth. Lean concrete with a strength of 200-300 psi
and three inches thick maximum may also be used as a leveling pad
material. The leveling pad should extend laterally at least a distance of
6 inches from the toe and heel of the lowermost SRW unit.
2.05 Drainage Aggregate
A. Drainage aggregate shall be angular, clean stone or granular fill
meeting the following gradation as determined in accordance with ASTM D422
Sieve Size Percent Passing
1 inch 100
3/4 inch 75-100
No. 4 0-60
No. 40 0-50
No. 200 0-5
2.06 Drainage Pipe
A. The drainage collection pipe shall be a perforated or slotted PVC, or
corrugated HDPE pipe. The drainage pipe may be wrapped with a geotextile
to function as a filter.
B. Drainage pipe shall be manufactured in accordance with ASTM D 3034
and/or ASTM D 1248
2.07 Reinforced (Infill) Soil
A. The reinforced soil material shall be free of debris. Unless otherwise
noted on the final, P.E. sealed, retaining wall plans prepared by the Wall
Design Engineer, the reinforced material shall consist of the inorganic
USCS soil types GP, GW, SW, SP, SM, meeting the following gradation, as
determined in accordance with ASTM D422:
Sieve Size Percent Passing
4 inch 100
No. 4 20-100
No. 40 0-60
No. 200 0-35
B. The maximum particle size of poorly-graded gravels (GP) (no fines)
should not exceed 3/4 inch unless expressly approved by the Wall Design
Engineer and the long-term design strength (LTDS) of the geosynthetic is
reduced to account for additional installation damage from particles
larger than this maximum.
C. The plasticity of the fine fraction shall be less than 20.
PART 3: DESIGN PARAMETERS
3.01 Soil
A. The following soil parameters, as determined by the Owner's
Geotechnical Engineer shall be used for the preparation of the final
design:
Unit Weight Internal Friction Cohesion (c)
(_) (pcf) Angle (_) (degrees)
Reinforced Fill ________ ____________ 0
Retained Soil ________ ____________ 0
Foundation Soil ________ ____________ __________
(If internal friction angles are not available for the above section, the
specifier can provide the USCS soil type classification for the
reinforced, retained, and foundation soils and/or attach the geotechnical
investigation report for this project.)
B. Should the actual soil conditions observed during construction differ
from those assumed for the design, design shall be reviewed by the Wall
Design Engineer at the Owner's Geotechnical Engineer's direction.
3.02 Design
A. The design analysis for the final, P.E. sealed retaining wall plans
prepared by the Wall Design Engineer shall consider the external stability
against sliding and overturning, internal stability, and facial stability
of the reinforced soil mass and shall be in accordance with acceptable
engineering practice and these specifications. The internal and external
stability analysis shall be performed in accordance with the "NCMA Design
Manual for Segmental Retaining Walls", using the recommended minimum
factors of safety in this manual.
B. External stability analysis for bearing capacity, global stability, and
total and differential settlement shall be the responsibility of the Owner
and the Owner's Geotechnical Engineer. Geotechnical Engineer shall perform
bearing capacity, settlement estimates, and global stability analysis
based on the final wall design provided by the Wall Design Engineer and
coordinate any required changes with Wall Design Engineer.
C. While vertical spacing between geogrid layers may vary, it shall not
exceed 2.0 feet maximum in the wall design.
D. The geosynthetic placement in the wall design shall have 100 percent
continuous coverage parallel to the wall face. Gapping between
horizontally adjacent layers of geosynthetic (partial coverage) will not
be allowed.
PART 4:CONSTRUCTION
4.01 Inspection
A. The Owner or Owner's Representative is responsible for verifying that
the Contractor meets all the requirements of the specification. This
includes all submittals for materials and design, qualifications, and
proper installation of wall system.
B. Contractor's field construction supervisor shall have demonstrated
experience and be qualified to direct all work at the site.
4.02 Excavation
A. Contractor shall excavate to the lines and grades shown on the project
grading plans. Contractor shall take precautions to minimize
over-excavation. Over-excavation shall be filled with compacted infill
material, or as directed by the Engineer/Architect, at the Contractor's
expense.
B. Contractor shall verify location of existing structures and utilities
prior to excavation. Contractor shall ensure all surrounding structures
are protected from the effects of wall excavation. Excavation support, if
required, is the responsibility of the Contractor
4.03 Foundation Preparation
A. Following the excavation, the foundation soil shall be examined by the
Owner's Engineer to assure actual foundation soil strength meets or
exceeds the assumed design bearing strength. Soils not meeting the
required strength shall be removed and replaced with infill soils, as
directed by the Owner's Engineer.
B. Foundation soil shall be proofrolled and compacted to 95% standard
Proctor density and inspected by the Owner's Engineer prior to placement
of leveling pad materials.
4.04 Leveling Pad Construction
A. Leveling pad shall be placed as shown on the final, P.E. sealed
retaining wall plans with a minimum thickness of 6 inches. The leveling
pad should extend laterally at least a distance of 6 inches from the toe
and heel of the lower most SRW unit.
B. Granular leveling pad material shall be compacted to provide a firm,
level bearing surface on which to place the first course of units.
Well-graded sand can be used to smooth the top 1/4 to 1/2 inch of the
leveling pad. Compaction will be with mechanical plate compactors to
achieve 95% of maximum standard Proctor density (ASTM D 698).
4.05 SRW Unit Installation
A. All SRW units shall be installed at the proper elevation and
orientation as shown on the final, P.E. sealed wall plans and details or
as directed by the Wall Design Engineer. The SRW units shall be installed
in general accordance with the manufacturer's recommendations. The
specifications and drawings shall govern in any conflict between the two
requirements.
B. First course of SRW units shall be placed on the leveling pad. The
units shall be leveled side-to-side, front-to-rear and with adjacent
units, and aligned to ensure intimate contact with the leveling pad. The
first course is the most important to ensure accurate and acceptable
results. No gaps shall be left between the front of adjacent units.
Alignment may be done by means of a string line or offset from base line
to the back of the units.
C. All excess debris shall be cleaned from top of units and the next
course of units installed on top of the units below.
D. Two VERSA-Tuff connection pins shall be inserted through the pin holes
of each upper course unit into receiving slots in lower course units. Pins
shall be fully seated in the pin slot below. Units shall be pushed forward
to remove any looseness in the unit-to-unit connection.
E. Prior to placement of next course, the level and alignment of the units
shall be checked and corrected, where needed.
F. Layout of curves and corners shall be installed in accordance with the
wall plan details or in general accordance with SRW manufacturer's
installation guidelines. Walls meeting at corners shall be interlocked by
overlapping successive courses.
G. Procedures C. through F. shall be repeated until reaching top of wall
units, just below the height of the cap units. Geosynthetic reinforcement,
drainage materials, and reinforced backfill shall be placed in sequence
with unit installation as described in Section 4.06, 4.07, and 4.08.
4.06 Geosynthetic Reinforcement Placement
A. All geosynthetic reinforcement shall be installed at the proper
elevation and orientation as shown on the final, P.E. sealed retaining
wall plan profiles and details, or as directed by the Wall Design
Engineer.
B. At the elevations shown on the final plans, (after the units, drainage
material, and backfill have been placed to this elevation) the
geosynthetic reinforcement shall be laid horizontally on compacted infill
and on top of the concrete SRW units, to within one inch of the front face
of the unit below. Embedment of the geosynthetic in the SRW units shall be
consistent with SRW manufacturer's recommendations. Correct orientation of
the geosynthetic reinforcement shall be verified by the Contractor to be
in accordance with the geosynthetic manufacturer's recommendations. The
highest strength direction of the geosynthetic must be perpendicular to
the wall face.
C. Geosynthetic reinforcement layers shall be one continuous piece for
their entire embedment length. Splicing of the geosynthetic in the design
strength direction (perpendicular to the wall face) shall not be
permitted. Along the length of the wall, horizontally adjacent sections of
geosynthetic reinforcement shall be butted in a manner to assure 100
percent coverage parallel to the wall face.
D. Tracked construction equipment shall not be operated directly on the
geosynthetic reinforcement. A minimum of 6 inches of backfill is required
prior to operation of tracked vehicles over the geosynthetic. Turning
should be kept to a minimum. Rubber-tired equipment may pass over the
geosynthetic reinforcement at slow speeds (less than 5 mph).
E. The geosynthetic reinforcement shall be free of wrinkles prior to
placement of soil fill. The nominal tension shall be applied to the
reinforcement and secured in place with staples, stakes or by hand
tensioning until reinforcement is covered by six inches of fill.
4.07 Drainage Materials
A. Drainage aggregate shall be installed to the line, grades, and sections
shown on the final P.E. sealed retaining wall plans. Drainage aggregate
shall be placed to the minimum thickness shown on the construction plans
between and behind units (a minimum of one cubic foot for each exposed
square foot of wall face unless otherwise noted on the final wall plans).
B. Drainage collection pipes shall be installed to maintain gravity flow
of water outside the reinforced soil zone. The drainage collection pipe
shall daylight into a storm sewer or along a slope, at an elevation lower
than the lowest point of the pipe within the aggregate drain.
4.08 Backfill Placement
A. The reinforced backfill shall be placed as shown in the final wall
plans in the maximum compacted lift thickness of 10 inches and shall be
compacted to a minimum of 95% of standard Proctor density (ASTM D 698) at
a moisture content within 2% of optimum. The backfill shall be placed and
spread in such a manner as to eliminate wrinkles or movement of the
geosynthetic reinforcement and the SRW units.
B. Only hand-operated compaction equipment shall be allowed within 3 feet
of the back of the wall units. Compaction within the 3 feet behind the
wall units shall be achieved by at least three (3) passes of a lightweight
mechanical tamper, plate, or roller.
C. At the end of each day's operation, the Contractor shall slope the last
level of backfill away from the wall facing and reinforced backfill to
direct water runoff away from the wall face.
D. At completion of wall construction, backfill shall be placed level with
final top of wall elevation. If final grading, paving, landscaping, and/or
storm drainage installation adjacent to the wall is not placed immediately
after wall completion, temporary grading and drainage shall be provided to
ensure water runoff is not directed at the wall nor allowed to collect or
pond behind the wall until final construction adjacent to the wall is
completed.
4.09 SRW Caps
A. SRW caps shall be properly aligned and glued to underlying units with
VERSA-LOK adhesive, a flexible, high-strength concrete adhesive. Rigid
adhesive or mortar are not acceptable.
B. Caps shall overhang the top course of units by 3/4 to 1 inch. Slight
variation in overhang is allowed to correct alignment at the top of the
wall.
4.10 Construction Adjacent to Completed Wall
A. The Owner or Owner's Representative is responsible for ensuring that
construction by others adjacent to the wall does not disturb the wall or
place temporary construction loads on the wall that exceed design loads,
including loads such as water pressure, temporary grades, or equipment
loading. Heavy paving or grading equipment shall be kept a minimum of
three feet behind the back of the wall face. Equipment with wheel loads in
excess of 150 psf live load shall not be operated within 10 feet of the
face of the retaining wall during construction adjacent to the wall. Care
should be taken by the General Contractor to ensure water runoff is
directed away from the wall structure until final grading and surface
drainage collection systems are completed.
END OF SECTION
|